banner
Products
Our customers know they can count on us for affordable prices and superior quality.
20t Per Day School Living Wastewater Treatment Solution Plant

20t Per Day School Living Wastewater Treatment Solution Plant

Overview Package Size 220.00cm * 200.00cm * 200.00cm Package Gross Weight 360.000kg 20T Per Day School living water trea;
Overview
Basic Info.
Model NO. QDEVU20TPD
Method Combined Treatment
Usage Industrial, Home, Agriculture, Hospital
Power 1.85kw
Apply Domestic Sewage; Sanitary Sewage
Color Green
Material FRP
Transport Package in Bulk
Specification 2m*2.2m
Trademark QDEVU
Origin China
HS Code 8421299090
Production Capacity 20 Sets/ Month
Packaging & Delivery
Package Size 220.00cm * 200.00cm * 200.00cm Package Gross Weight 360.000kg
Product Description
20T Per Day School living water treatment solution plant Including facultative tank, aerobic tank ,MBR tank systerm

Product Description

Principle of work
The integrated sewage treatment equipment elimination organic matter pollutant and the ammonia nitrogen mainly according to depend in equipment,s AO biological treatment craft.And the principle od work is in a level,because the sewage organic matter density is very high,the microorganism is at the anoxic condition,the time the microorganism is the optional microorganiam,they decompose the sewage in organic nitrogen transformation NH3-N,simultaneously uses the organic carbon to take the electron donor,NO2-N,NH3-N transforms N2,moreover also synthesizes the new cellular substance using the part organic carbon carbon source and NH3-N,therefore a level pond not only has certain matter elimination function,reduces the following good oxygen pond the organic load,favors the nitrification advance,moreover according to the high density organic matter which exists depending on the raw water,completes the denitrification,disappears finally the denitrogenation eutrophication pollution.In O levels,because the organic matter density reduced large scale,but still had the ration organic matter and the high NH3-N existence,to enable the organic matter to obtain further oxygenolysis,simultaneously in the carbonification is in completes in the situation the nitrification to be able to carry on smoothly,in o level of establishment organic load low good oxygen biology contact oxidation pond,mainly has the good oxygen microorganism and form the oxygen bacterium in o level of ponds(nitrifying bacteria ).And the good oxygen microorganism decomposes the organic matter CO2 and H2O;From the oxygen bacterium(nitrifying bacteria)produces using the organic matter decomposition in the inorganic carbon or air CO2 takes the nutrition source,transforms the NO2-N,NO3-N,o level pond sewage in NH3-N the water leakage partial refluxes to a level pond,is a level pond provides the electron acceptot.Disappears finally through the denitrification the denitrogenation pollution.
Performance features:

  1. Used international advanced biological treatment processes,set to remove BOD5,COD,NH3-N in one,with stable performance and reliable technology,good effect,low investment,small footprint,easy maintenance and so on.
  2. Equipment can be embedded in the ground, surface above the equipment can be used as green or other land ,not housing and heating ,insulation.
  3. Two biological contact oxidation process are the use of plug-flow biological contact oxidation,the treatment is better than completely mixed or two series completely mixed biological contact oxidation pond.
  4. Activated sludge volume is small,the water quality of adaptability,resistance to shock loading performance,water quality and stability will not result in sludge bulking.
  5. Pool using a new flexible three-dimensional packing,larger surface area,easy to hang microbial film,stripping. The same organic load conditions, high removal rate,can increase the oxygen in the air solubility in the water.
  6. Biochemical use of biological contact oxidation pond, and its relatively low filler volume loading,micro-organisms in their oxidation stage, producing less sludge,only three months( 90 days) above a row of mud( with a truck into a mud suction or dehydration cake Sinotrans).
  7. Deodorant manner in addition to conventional high-altitude exhaust, comes with soil deodorization measures.
  8. Equipped with automatic control systems and electrical equipment failure alarm system,safe and reliable operation,usually don't need someone to manage,only timely maintenance and repair of equipment.

Application
Hotels,restaurants,nursinghomes,hospitals,residentialareas,village,owns,stations,airports,ports terminals,ship,factories,mines, tourist spots,landscapes,similar to the sewage of various industrial organic wastewater.
Major technique parameter
ModelQDCK1QDCK2QDCK3QDCK5QDCK7QDCK10QDCK15QDCK20QDCK25QDCK30QDCK40QDCK50
(m3/h )Process load1235710152025304050
()Number of articles111123344455
Air blower(m3/min)Amount of wind0.310.590.671.021.722.54.114.112.5×24.11×24.11×24.11×3
(m.Mh2o)Wind pressure500050005000500050005000500050005000500050005000
(KW)Power0.550.751.5.52.23.75.55.53.7×25.5×25.5×25.5×3
Water pump(m3/h)Current capacity)1235710152025304050
(m)Lifting888888888888
(KW)Power0.550.550.550.750.750.750.751.51.52.23.75.5
(m2)Area61014192839587593113143168

Detailed Photos


20t Per Day School Living Wastewater Treatment Solution Plant

20t Per Day School Living Wastewater Treatment Solution Plant

20t Per Day School Living Wastewater Treatment Solution Plant

20t Per Day School Living Wastewater Treatment Solution Plant

20t Per Day School Living Wastewater Treatment Solution Plant

Certifications

Packaging & Shipping

Company Profile

Our Advantages


1,Thirteen years experience in wase treatment facilitis. 2 , Cooperating customers all over the word. 3, The pursuit of company.
We based on "technological development, pollution remediation, wholeheartedly for customer services". We hope to cooperate withall customers from all over the world and build a better world together.

After Sales Service

1.24-hour a day, 365-day a year access to a toll-free health care professional hotline for questions and trouble-shooting assistance freely.

2.all year round on site installation and debugging service abroad with professional engineer guide and training.

3. professional guide installation and operation

4. Manual book in English will accompany with the machine to arrive your destination.

5. Technical drawing, layout .

Send inquiry